
GR-DIP-50KGH Dry Ice Pelletizer
On-demand dry ice pellet production from liquid CO₂ — reduce delivery cost and sublimation loss.
Specifications
| Production Capacity | 88–110 lb/hr (40–50 kg/h) |
|---|---|
| Pellet Sizes | 3 mm (1/8"), 16 mm (5/8"), 19 mm (3/4") |
| Dry Ice Density | 96.8 lb/ft³ (1550 kg/m³) |
| Conversion Rate | ≥ 42% (LCO₂ to solid) |
| Rated Power | 4 HP (3 kW) |
| Dimensions | 39.4" × 19.7" × 39.4" |
| Net Weight | 386 lb |
| Voltage | Customizable to local power standards |
Free technical consultation · Industrial quality guaranteed · Worldwide shipping
Shipping & warranty
Shipping & delivery
Equipment and accessories can be shipped internationally. Freight, lead time, customs responsibility, and delivery access are confirmed for the destination and final order configuration.
Read the shipping policy →Limited warranty
This machine includes a one-year limited warranty from the documented delivery date for verified defects in materials or workmanship. Consumables, wear items, hoses, nozzles, seals, filters, and damage caused by misuse or improper utilities are not covered.
Read the complete warranty policy →Built for the work.
GR-DIP-50KGH converts liquid CO₂ (LCO₂) into high-density dry ice pellets on site, giving you fresh media when you need it and reducing dependence on delivery schedules.
High conversion efficiency (≥42%) lowers CO₂ consumption cost. High-density pellets (1550 kg/m³) sublimate more slowly and perform better for blasting and cold-chain use. Supports 3 mm pellets for blasting plus 16 mm and 19 mm for cold-chain and food applications. PLC control for stable, repeatable production.
Where it performs.
- Dry ice blasting: 3 mm pellets for compatible blasting systems
- Cold-chain logistics: pharmaceuticals and perishables
- Food & beverage: flash chilling
- Laboratory and R&D: temperature control
What’s included.
- GR-DIP-50KGH pelletizer unit with PLC control
- Pellet size tooling (confirm die sets at order time)
Specify before delivery.
Confirm utilities, site access, operating environment, consumables, ventilation, PPE, delivery handling, and local requirements before finalizing the configuration.
Discuss your application →Related guidance




